Recycling Tire Rubber - Saving Irrigation Water

About The Video

The link below will go to a SkyDrive video that shows a Skidmark Geomembraneā„¢ installation completed in December 2011. Temperatures varied from a low of 20 degrees F in the morning to a high of 40 degrees most days. The section of canal that was lined is one quarter mile long and fabrication was completed in 8 days.

This is not a typical installation, as the fabrication was performed on plywood bridges above the water. This canal is fed in the off season by springs and ground water.

For the interested irrigation district manager or board member, this video will provide a visual representation of how Skidmark Geomembrane handles and it's tolerance of puncture resistance.

GO TO VIDEO